Steel fabrication and pipework on an industrial site

PRJ / Project Experience

Delivered across Shell, Agip & Addax operated assets.

A track record of manifold, flare, fencing, and integrity works executed for major operators and their main contractors across the Niger Delta.

Project Register

Selected project experience

Construction and erection of enhanced manifold caging
PRJ-001

SPDC Obigbo Manifold, Kom Kom

Construction and erection of enhanced manifold caging

Client
Shell Petroleum Dev. Co. Ltd (Main Contractor: Packlinc Ltd)
Duration
Jun – Sept 2024
Construction and erection of enhanced manifold caging – photo 1
Construction and erection of enhanced manifold caging – photo 2
Construction and erection of enhanced manifold caging – photo 3
Design, construction, and installation of 16-inch smokeless flare stack
PRJ-002

Imo River 2 Flow Station

Design, construction, and installation of 16-inch smokeless flare stack

Client
Shell Petroleum Dev. Co. Ltd (Main Contractor: Jurak Oil Ltd)
Duration
Aug – Dec 2025
Design, construction, and installation of 16-inch smokeless flare stack – photo 1
Design, construction, and installation of 16-inch smokeless flare stack – photo 2
Design, construction, and installation of 16-inch smokeless flare stack – photo 3
Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwall
PRJ-003

Oshie Flow Station

Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwall

Client
Nigeria Agip Oil Co. Ltd (Main Contractor: Jurak Oil Ltd)
Duration
2020 – 2021
Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwall – photo 1
Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwall – photo 2
Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwall – photo 3
Installation of citadel fencing around the Ossu manifold
PRJ-004

OML 124

Installation of citadel fencing around the Ossu manifold

Client
Addax Petroleum Development Nigeria Limited
Duration
2021 – 2022
Installation of citadel fencing around the Ossu manifold – photo 1
Installation of citadel fencing around the Ossu manifold – photo 2
Installation of citadel fencing around the Ossu manifold – photo 3

Project Register

Full project schedule

RefClientLocationProject titleDuration
PRJ-001Shell Petroleum Dev. Co. Ltd (Main Contractor: Packlinc Ltd)SPDC Obigbo Manifold, Kom KomConstruction and erection of enhanced manifold cagingJun – Sept 2024
PRJ-002Shell Petroleum Dev. Co. Ltd (Main Contractor: Jurak Oil Ltd)Imo River 2 Flow StationDesign, construction, and installation of 16-inch smokeless flare stackAug – Dec 2025
PRJ-003Nigeria Agip Oil Co. Ltd (Main Contractor: Jurak Oil Ltd)Oshie Flow StationDesign, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwall2020 – 2021
PRJ-004Addax Petroleum Development Nigeria LimitedOML 124Installation of citadel fencing around the Ossu manifold2021 – 2022

Site Gallery

Project photo gallery

A visual record of works executed across our registered project sites.

Construction and erection of enhanced manifold cagingPRJ-001
Construction and erection of enhanced manifold cagingPRJ-001
Construction and erection of enhanced manifold cagingPRJ-001
Design, construction, and installation of 16-inch smokeless flare stackPRJ-002
Design, construction, and installation of 16-inch smokeless flare stackPRJ-002
Design, construction, and installation of 16-inch smokeless flare stackPRJ-002
Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwallPRJ-003
Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwallPRJ-003
Design, construction, and installation of twin 30-inch smokeless flare, auto ignition system and bondwallPRJ-003
Installation of citadel fencing around the Ossu manifoldPRJ-004
Installation of citadel fencing around the Ossu manifoldPRJ-004
Installation of citadel fencing around the Ossu manifoldPRJ-004

Field Works

Additional site works

Further technical works executed in the field, alongside our registered project experience above.

FW-01

De-sanding / desludging of a 25,000-barrel crude oil storage tank at Addax Izombe Flow Station

FW-02

Hydro-testing of pre-fabricated piping spools

FW-03

Steel structural fabrication of canopy structures for Addax Petroleum